2011 Projects

 

Archerfield

ArcherfieldThis project entailed 130m of heavy duty grated drains to be installed to manufacturers specification, followed by asphalt apron. The grate took all overland flow into an existing storm water system saving the client maintenance costs and improving safety.

 

  Salisbury

SalisburyThe contract involved removing and replacing approximately 6,800ms of concrete. The job was completed three weeks ahead of schedule with the use of high early strength concrete allowing minimal disruption to the 24 hour operation of the tenant.

 

Albion

AlbionThis job required the removal of approximately 6000m3 of asbestos contaminated soil and then importing 10,000m3 of fill material for the building pad. The job was completed within 2 weeks.

 

Sheldon

Sheldon CollegeThe Sheldon College project had a very tight timeframe to be completed over the Christmas holiday break and included road construction, coloured concrete, bollards, storm water and asphalt overlay to the existing carpark.

To view further photos of each project click on the relevant photo or project name

 