2012 Projects

 

 Tennis Centre

Tenns CentreThis job had a very tight timeline, we had 6 days to construct a 2m wide footpath and fence on both sides so that crowds coming from the train could attend the tennis tournament.

 

 Clayfield

ClayfieldThis project was an 11 lot subdivision with no internal roads. The job required earthworks, drainage, sewer, water, retaining wall and turf.

 

 

Ipswich

IpswichThe project entailed extending the storm water pipe and constructing a man hole in the roadway of a busy street.

Acacia Ridge

Acacia RidgeAn industrial subdivision requiring imported fill, sewer, water main, storm water, retaining walls, asphalt, road widening and landscaping.

To view further photos of each project click on the relevant photo or project name

 

ShareFacebookTwitterGoogle+LinkedInPinterestStumbleUponbuffer